AI Project / Demand and Pricing

Define the Scope and Price Before Starting an AI Project

Why are there such large price differences for websites called membership websites? Break down the scope of work from common functions, then compare the total price, working hours, phased cooperation, and monthly fees to clarify what the fees cover.

Published:

Original concept illustration of a project planning desktop in the style of Grisseau

ARTIST REFERENCE / Artist Introduction

Juan Gris

Juan Gris

Cubism, Geometric Planes, and Collage

Juan Gris (1887–1927), born in Madrid, Spain, was an important Cubist painter. He reorganized everyday objects using geometric planes and explored the visual order between objects, space, and the picture by using paper collage and color relationships.

Style reference • Original concept illustration, not the artist's own work.Biography

Before quoting a price, define the scope of the project

One requirement only lists "registration, login, member page", while another requires regular deductions, expiration suspension, cancellation of renewal, and customer service order tracking. The appearance may be similar, but the number of situations to be handled behind the scenes is much greater.

Therefore, before quoting a price, the operation and rules need to be broken down. AI has created several pages of visuals, which only illustrate part of the progress; data, integration, testing, and handover must be included in the scope of work item by item.

Breaking down from project name to the first draft scope

The table below lists several common types. First, circle the necessary processes, then look to the right at the tasks that are easily overlooked.

Project TypesCommon NeedsEasily overlooked details
Brand Website, PortfolioService Introduction, Case Studies, Contact Form, SEOMobile Version, Image Speed, Content Update Method
Event Registration SystemSessions, Quotas, Waiting List, NotificationsDuplicate Registration, Simultaneous Quota Grabbing, Cancellation and Replacement
Membership and Subscription SystemRegistration and Login, Membership Levels, Service PermissionsForgot Password, Expiration Processing, Account Deactivation
E-commerce and Payment SystemProducts, Shopping Cart, Orders, PaymentInventory synchronization, refund, and resending payment notifications
Reservation and Scheduling SystemAvailable time slots, staffing, remindersTime slot conflicts, rescheduling, cancellation, and time zones
Customer Management SystemCustomer data, inquiry records, follow-up statusRepeat customers, data permissions, inbound and outbound transfers
Internal Administrative SystemLeave, expense reimbursement, approval, document managementProxy approval, return for modification, operation records
Inventory and Asset ManagementInbound and outbound, inventory count, borrowing and returningSimultaneous changes, quantity tracking, damage and loss
Reports and DashboardsData integration, indicators, filtering, chartsIndicator definition, update frequency, missing data
AI Knowledge AssistantFile search, summary, Q&A, source citationFile version, access permissions, answer verification
Automated connectionData synchronization, notification, status updateRepeated triggering, execution failure, retry and redo

For example, "reservation" also requires deciding on conflicts, cancellations, and rescheduling; "members" also require account retrieval and expiration processing. These rules are marked as pending until confirmed.

Break down the workload from the operation

Taking event registration as an example, the requirements can be written to this extent:

Participants can select a session, fill in their name and email. After the system confirms there are still spots available, it saves the registration record and returns the registration number. When the quota is full, processing stops, and duplicate records cannot be added during the same retry submission.

This way, it's possible to know who operates, what data is sent, what restrictions are followed, and what is seen upon success. During acceptance testing, the same description can be used for actual operation.

RequirementsContent to be Confirmed
Who will use it?Visitors, members, staff, or administrators.
What needs to be accomplished?Query, create, modify, review, or make payments.
What documents are needed?Fields, data sources, associations, and storage methods.
What are the limitations?Permissions, quotas, time, and status.
How to handle failure?Duplicate submissions, interruptions, errors, or external service failures.
How to accept it?Which scenarios must be actually completed?
Who will maintain it?Who updates the content, manages the account, and handles issues?

Before AI organizes the fields and specifications, the rules should be confirmed by someone familiar with the business. Especially in cases of cancellation, refund, or reaching the limit, the tool should not be allowed to make decisions automatically.

Figure 1 | From idea to delivery conditions, ensure the scope and acceptance are aligned.
Figure 1 | From idea to delivery conditions, aligning scope with acceptance. Dot plot to reveal full dimensions.

Quotations should not only be based on page count.

A one-page registration form can only collect names, or it can simultaneously verify membership, collect payments, control quotas, and issue vouchers. The number of pages remains the same, but the number of systems that need to be connected and the number of failure scenarios have increased.

Work ItemsContents
Requirements and PlanningInterviews, process organization, specifications and acceptance criteria
Design and ContentVisuals, layout, workflow, copywriting and materials
System DevelopmentFront-end, Back-end, Database and Management Interface
External IntegrationPayment, Mail, Login, Existing Systems or APIs
Testing and DeploymentFunctions, Permissions, Abnormal Processes, Deployment Settings
Handover and MaintenanceOperation Instructions, Account Transfer, Backup and Follow-up Support

If interviews, data supplementation, or reorganization of existing processes are required, these should also be included in the deliverables, not hidden in the "Website Development" project.

How can we combine five billing methods to meet our needs?

If the requirements are clear, the total price can be discussed; if problems still need to be investigated, set a time limit or phase limit first. The following is a billing model, not a price list. Planning can be done first for the same project, and then development can be estimated separately.

Pricing ModelHow to CalculateSuitable SituationsShould be agreed upon first
Fixed Total PriceQuote a price based on a clear scopeStable demand, clear deliverablesFunctional scope, number of modifications, acceptance and change methods
Working hoursCalculate based on actual hours investedTroubleshooting, modifying existing systems, exploratory workRate, working hours record, budget limit and return frequency
Phased pricingPricing is done separately for planning, prototyping, development, and launchLarger scale, or needs still need verificationStage deliverables, payment milestones, and continuation status
Monthly fee cooperationMonthly provision of agreed-upon service volumeContinuous updates, maintenance, and feature iterationsWorkload, priority, response time, and excess costs
Value-driven pricingNegotiating based on expected commercial value and delivery responsibilityClear performance objectives and reasonable value assessmentEvaluation benchmarks, influencing factors and delivery boundaries
Figure 2 | Choose a collaboration method based on the characteristics of the work; different modes can also be used in combination.
Figure 2 | Select cooperation method based on work characteristics; different modes can also be used in combination. Click the image to open the full size.

Fixed Total Price

When demand is stable, the total price facilitates budget allocation. Pages, functions, material providers, number of modification rounds, and additional billing items should all be included in the quote.

Write the scope of modifications as actionable conditions: which characters and graphics can be replaced, how many confirmations are needed, and when to finalize the draft. If a different payment or management system is added, reassess the situation to avoid treating new features as general fixes.

Working hours

When taking over an old system, it's often necessary to first read the code and reproduce the errors to understand the extent of the problem. This type of exploratory work can be charged based on actual hours worked.

First, set an upper limit for investigation hours. After investigation, submit the problem, options, and estimates before deciding on the next step; work hour records should reflect specific work and outputs.

Phased pricing

When ideas are still evolving, complete the planning or prototype first before deciding on formal development. The first phase delivers the process, fields, and prototype; the next phase focuses on the main functions and integration.

At the end of each phase, usable results should be available. If it's decided not to continue, how documents, designs, and programs will be handed over should also be agreed upon before starting.

Monthly fee cooperation

After launch, continuous content updates, bug fixes, or minor feature adjustments can be supported using a monthly fee.

The monthly fee should specify capacity, response time, overage allowance, and emergency support. Modifications to existing forms and additions to subscription features should not be simply glossed over as "website updates."

Value Orientation

The value of some projects comes from reducing manual processing, minimizing errors, or making it easier for customers to complete operations. Fees can be discussed based on these goals.

For example, if the goal is to reduce manual processing, the steps to be improved and how to measure them can be agreed upon. Results such as revenue, which are influenced by the product and market, should be clearly stated separately, along with shared responsibilities.

How is the cost reflected when using AI?

Generating programs and images is only part of the work. Understanding requirements, debugging, integration, communication, and delivery also take time.

Hourly rates are calculated based on the agreed-upon actual input, while fixed-price rates are based on the scope of delivery. Which algorithm to use should be clearly stated before cooperation to avoid changing the algorithm halfway through.

When discussing costs, reconcile the time saved with the delivery: Was the project duration shortened? Was testing increased? Was more usable content obtained? If not, you can also ask what inputs were included in the original quote.

Continuing Fees and Subsequent Expansion

Domains, hosts, databases, storage, emails, SMS, AI and external APIs, payment, platform subscriptions and maintenance may not be included in the one-time development fee. Clarify who will pay for each item.

Figure 3 | Implementation, ongoing operation, and new changes should each have a separately defined billing scope.
Figure 3 | Setup, continuous operation and new changes should each specify the billing scope. Click the image to open the full size.

Some are fixed monthly, some increase with usage. Also specify who applied for the account, whether there is a limit, and whether it can be transferred upon termination of cooperation.

If the system itself will charge users, define the number of users, the amount or usage measurement method, and how to handle exceeding the limit.

Taking event registration as an example, first circle the first version.

Assuming the first version only requires event introduction, forms, data saving, and backend list, complete these four items first. Other requirements are estimated separately:

New RequirementsAdditional Processing Required
Online PaymentOrder status, payment notification, failure and refund process
Waiting ListSorting Rules, Notifications, Response Deadlines, and Quota Reservation
Member LoginIdentity Verification, Account Management, and Data Access
Automatic Email DeliveryTemplates, Delivery Records, Retry, and Service Fees
Multiple OrganizersData Segregation and Management Access for Different Organizers

For each added item, clearly explain which rules and systems it affects. First, implement the necessary processes, and then expand them according to usage. Budgets and changes are also easier to track.

Once you've read the quote to the end, you should be able to begin the acceptance process.

Objectives, scope, deliverables, excluded items, material responsibilities, schedules, payment methods, and change orders must all align with the actual work.

Reconfirm how the program and data will be delivered, who owns the account, where maintenance will be handled, and who will bear the costs for third parties.

Have both parties explain "how completion is defined." If the answers differ, add the discrepancies to the specifications before starting production.

Artist Profiles

  1. The Metropolitan Museum of Art:Juan Gris,Book and Glass
Contact on LINE